Item type | Current library | Call number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|
Gradution Project | Centeral Library Second Floor - Engineering & Architecture | GP28ENG2006Communications&Electronics (Browse shelf(Opens below)) | Available | 8234 |
Browsing Centeral Library shelves, Shelving location: Second Floor - Engineering & Architecture Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
GP27ENG2006Industrial Engineering Applying design for six siga (DFSS) to a breaking plate factory/GP/Dr.Nahed Sobhi | GP28 ENG 2010 ARCH General Hospital \ | GP28ENG2004Industrial Implementation of Computerized Maintenance in Stone Manufacturing/GP/Dr.Tawfik T. El-Midany/Dr.Adel Taha Abbas/Dr.Said Ashour | GP28ENG2006Communications&Electronics Tire Pressure Monitoring System/GP/Dr.Gamal El-Sheikh. | GP 29 ENG 2021 ARCH Central Bank of Egypt // GP // Dr. Sameh EL-Feky, Dr. Omar Fawzy, Dr. Tarek Abdelsalam, Dr. Nihal Amer | GP29ENG2002Communications&Electronics Audio - Video wirless transmitter/GP/Dr. Mahmoud Allam | GP2ENG2003Communications Design and Implementation of a Synthesized FM Transmitter/GP/Dr.Samir Hassan. |
There are no comments on this title.
Log in to your account to post a comment.