| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Gradution Project
|
Centeral Library Second Floor - Engineering & Architecture | GP159ENG2017 Industrial (Browse shelf(Opens below)) | Available | 81597 | ||||||||||||||
Compact Disk
|
Centeral Library Second Floor - Engineering & Architecture | GP159ENG2017 Industrial (Browse shelf(Opens below)) | Available | 498 ENG | 900051797 |
Browsing Centeral Library shelves,Shelving location: Second Floor - Engineering & Architecture Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| GP157ENG2017Industrial Productivity Improving in Refrigerators Manufacturing Company // GP // DR // Nahed Sobhi | GP158ENG2017Industrial Development of A Traceability System in Electrometer Factory // GP // Dr. Nahed Sobhi | GP159ENG2017 Industrial improvement of production line in a metal rack factory // GP // Dr. Sameh Ahmed | GP159ENG2017 Industrial improvement of production line in a metal rack factory // GP // Dr. Sameh Ahmed | GP15ENG2004Industrial Computerized Capital Maintenance Planning for Fire tube Boiler/GP/Dr.Attia H.Gomma | GP15ENG2009Communications Implementation earth station networkprotocol/GP/Dr. Gada Farouk | GP 16 Architecture Science and Technology Park |
There are no comments on this title.
Log in to your account to post a comment.

Text