35986841_10216840653711318_1105697261150535680_n

improvement of production line in a metal rack factory // GP // Dr. Sameh Ahmed

By: Material type: TextPublication details: MSA, 2017Description: 51 p. 24 cmOther title:
  • تحسن خط الإنتاج بمصنع أرفف حديد
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
Gradution Project Centeral Library Second Floor - Engineering & Architecture GP159ENG2017 Industrial (Browse shelf(Opens below)) Available 81597
Compact Disk Centeral Library Second Floor - Engineering & Architecture GP159ENG2017 Industrial (Browse shelf(Opens below)) Available 498 ENG 900051797

There are no comments on this title.

to post a comment.
Share