| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Gradution Project
|
Centeral Library Second Floor - Engineering & Architecture | GP 12 ENG 2022 Computer Systems (Browse shelf(Opens below)) | Available | 82341 |
Browsing Centeral Library shelves,Shelving location: Second Floor - Engineering & Architecture Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| GP11ENG2004Industrial Preventive Maintenance of Centrifugal Fire Pumps / GP / DR/Ahmed Khalil | GP 12 ENG 2021 ELECTRICAL Li-Fi Lan / | GP 12 ENG 2021 ELECTRICAL Li-Fi Lan / | GP 12 ENG 2022 Computer Systems Al Based Early Lung Cancer Diagnostic Framework / | GP120 ENG2016 Applying Total Productive Maintenance at pepsico \ GP : Dr. Nahed Sobhi | GP121 ENG2016 Industrial Engineering Implement Material Requirements Planing Syatem in Textile Factory \ GP : Dr. Nahed Sobhi | GP121 ENG2016 Industrial Engineering Implement Material Requirements Planing Syatem in Textile Factory \ GP : Dr. Nahed Sobhi |
Faculty of Engineering - Computer Systems Engineering Department
There are no comments on this title.
Log in to your account to post a comment.

Text