Enterprise Resource Planning Implementation/GP/Dr.Nahed Sobhi.
Material type: TextCopyright date: 2007Content type:- text
- unmediated
- volume
- 36986327158
- 620
Item type | Current library | Call number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|
Gradution Project | Centeral Library Second Floor - Engineering & Architecture | GP2ENG2007Industrial (Browse shelf(Opens below)) | Available | 8145 |
Browsing Centeral Library shelves, Shelving location: Second Floor - Engineering & Architecture Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
GP29ENG2002Communications&Electronics Audio - Video wirless transmitter/GP/Dr. Mahmoud Allam | GP2ENG2003Communications Design and Implementation of a Synthesized FM Transmitter/GP/Dr.Samir Hassan. | GP2ENG2003ElectricalEngineering IS-95 CDMA System/GP/Dr.Anwar Helal/Dr.Ayman Elezabi/Dr.El Sayed El Badawy/Dr.Tareif ElShafei. | GP2ENG2007Industrial Enterprise Resource Planning Implementation/GP/Dr.Nahed Sobhi. | GP2ENG2008ComputerSystemEngineering Interfacing betwen microprosor training KIT and PC/GP/Dr. Mohamed Allam | GP 30 ENG 2021 ARCH The Equestrian Complex // GP // Dr. Sameh EL-Feky, Dr. Omar Fawzy, Dr. Tarek Abdelsalam, Dr. Doaa Abdo, Dr. Ghada Ghazala and Dr. Rasha Sayed | GP30 ENG2004 Communications&Electronics Design and Implementation of Electronic Current Relays (ECR) /GP/Dr.Khaled Shehata. |
There are no comments on this title.
Log in to your account to post a comment.